Dec 17, 20181 min read
Thames Water PPS Programme
We are currently working on the Thames Water PPS AMP 6 Programme completing Mechanical and Electrical upgrade works to the Small Private...
36 views0 comments
Ryan
Dec 17, 20181 min read
Affinity Water Fairfield Reservoir
We completed a new three pump booster pumping station installed at Fairfield where we provided a site manager on this project from the...
23 views0 comments
Ryan
Dec 17, 20181 min read
South East Water Blackhurst Tower
We carried out a decommissioning and strip out on an existing two pump booster pumping station at Blackhurst Tower, which was carried out...
34 views0 comments
Ryan
Dec 17, 20181 min read
Production Line LV Installation
We were asked to install a New Distribution Board to supply several control panels on a new production line. We also installed new...
15 views0 comments
ryanrob15
Dec 17, 20181 min read
Leathermarket Office Refurbishment
Works was a complete refurbishment of an existing office due to new tenants. It consisted of removal of existing Lighting, Small Power,...
13 views0 comments